The main cap frame timbers arrive! |
The cap circle already laid out on blocks (the blocks were made from the old sail stock - you can see how badly decayed it was down the middle) |
The shears offloaded |
The frame and fan booms assembled |
Next we raised the lower finial section with a tripod - ready to receive the cap ribs...
Hoisting the finial |
First ribs going in |
The more you add, the stronger it gets! |
Errr, how do I get down |
With all the ribs fitted, and the ring purlin attached. Very aesthetically pleasing. |
No comments:
Post a Comment