The bolter frame and cabinet are almost complete. Original pieces have been incorporated as much as possible. Here you can see the original back panel (after some repair) with the new frame and panelling. The original bearing will support the driven end of the cylinder.
The new bolter will be installed in the mill at a later date, once the nearby flooring and surrounding areas are sorted out.
No comments:
Post a Comment