Sack hoist drive drum |
New pieces let-in |
Drive drums for boulters |
A mixture of on and off-site work since the last post. Off-site we have started to restore the drive drum for the sack hoist. This has been affected by woodworm but there is plenty of 'meat' left in it. The worst bits have been cut away and new pieces let in. Its a similar story with the drive drums for the boulters. These are also being repaired, backed up with a layer of plywood to support the fragile structure. (This won't be visible when completed). Meanwhile, on-site work continues on the replacement bin floor joists - the original millwrights seem to have made-do with what material was available - so each joist housing has its own peculiarities - very time consuming to refit.
No comments:
Post a Comment