The original door to the bin floor has been absent for some time. The opening had been blocked up with timber and wire mesh. To improve the weatherproofing of the mill, a new 'stable' door has been made. This was fitted today, with the surrounding frame assembled on site and fixed to the stone. Long term - this will help with access for long timbers and so on...